Description
- The operation and interval time of MAG are controlled pneumatically.
- A solenoid valve can be added as a switch for the pneumatic pressure supply to control the ON/OFF switch of MAG upon request.
- The operation time (ON) should be set up as 25 seconds, and the interval time (OFF) should be set up as 5 seconds to complete one operation cycle.
- MAG requires 4-8kgf/cm2 pneumatic pressure supply to have the corresponding 117-290kgf/cm2 operating pressure. It can meet different pressure requirements and applications.
- Please refill grease from the grease inlet to prevent air and impurities from entering the grease tank.





